activities

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

activities [2020/07/16 09:45]
christian created
activities [2023/07/06 10:21] (current)
christian
Line 1: Line 1:
 ====== Activities ====== ====== Activities ======
  
-===== KU060 Primitives Characterization ===== 
  
-**Current Status:**+===== 20nm Kintex-Ultrascale  KU60 DUT =====
  
-  Kintex-Ultrascale (20nm) in manufacturing +    KU060 Rev. 1 cards have been manufactured, deliveries in July 2020 
-  * Next Step: Get test IP ready testing is scheduled to start in Summer 2020 at LBNL.+    * Next Step: 
 +      * Get test IP ready testing is scheduled to start after Summer 2020 at LBNL. 
 +    * Beam time resources needed! 
 +    * Gen4 Backplane and FMC PCB-Fix Available
  
 +===== KU060 Radiation Test at TAMU 19-22 April =====
  
-**Tested parts:**+  For the duration of the test campaign no webex meetings will take place 
 +  You can chat with Gary and Mike while they are streaming the test 
 +  There will be an online beam-log (google docs)
  
-  * space partXQRKU060-CNA1509 **(Xilinx-donated)** +  * You are invited to join the test via Jitsi Meet by taking your web browser to this URL: 
-  commercial-equivalent part **XCKU060-1FFVA1517I** +    https://meet.jit.si/TAMUtest (try Chrome or Firefox
-  * The KU060 DUT card accommodates either part+    Password: [[activities:tamu2021|see (internal page)]] OR contact christian.fuchs (at) dependable.space
  
 +  * KU060 Testing with Boeing (19th - 22nd):
 +  * here are the hours in world time:
 +    * 6:00 to 14:00 US Pacific Time
 +    * 8:00 to 16:00 US Central Time
 +    * 15:00 to 23:00 Central European Summer Time (CEST)
 +    * 21:00 to 5:00 China Time Zone
 +    * 22:00 to 6:00 Japan Time Zone
  
-**Target beam trips:**+=== 16nm US+ latchup suppression experiment ===
  
-  * Beam time resources needed! +    * Next Step: Waiting to test functionally in September 
-  Berkeley, focused tests, usually 12-24 hours +    * Test boards - ZCU102 with ZU9EG DUT - (6=NGC, 2=Sandia, 2=Aerospace, 3=Xilinx) 
-      ? [ Aerospace/USMDA?] +    * Beam time resources needed: 
-      * first preview beam time sharing together with US+ latchup demo  +      <del>USMDA 48h in 2 groups at Berekely</del> 
-  * Texas A&Mmain data collection tests, usually 48-72 hours +        <del>3x8h during Aug. 5th-7th and 3x8h during Sep. 21st-23rd</del> 
-      * spare time in August, from Raytheon available if this proposal is granted+      * <del>The Berkeley Cyclotron failedhence testing on Aug. 5th-7th was not possible.</del> 
 +      * <del>New test date is scheduled for March 2021</del> 
 +      * New test date is scheduled for April 2021 at TAMU
  
-**Currently allocated beam time:** 
  
-  * Aerospace: 16 hours promised (TODO assert this is still the case) +===== Zynq MPSoC/16nm Latch-Up Mitigation Test at LBL April 28th May 2nd =====
-  * USMDA 48h in 2 groups at Berekely -- 3x8h during Aug. 5th-7th plus 3x8h during Sep. 22nd/27rd  +
-    * (mostly for US+, but also for KU060) +
-  * Boeing: yes, assert how much and when (ideally TAMU) +
-  * RAYTHEON: yes, assert how much and when (ideally TAMU) +
-  * others: please get in touch and let us know!+
  
 +  * View the Live-Updated [[https://docs.google.com/document/d/1U7FbZHG_T_049qorlxuMySQYWVYfJ4p9ysJTXDuewf0/edit#heading=h.jltys38rhgql|Beam-Log and Test plan]] (google docs)
  
-**Schedule:**+  * **You are invited to join the test via Jitsi Meet by taking your web browser to this URL:** 
 +    * https://meet.jit.si/LBLtest (try Chrome or Firefox) 
 +    * Password: [[activities:lb2021|see (internal page)]] OR contact christian.fuchs (at) dependable.space 
 +    * **You can use the text-chat function in this call and chat with Gary and Mike while they are streaming. Please make SURE to mute your microphone at all times and turn your camera off. Do not allow camera use. 
 +** 
 + 
 +  * **There will also be an interactive briefing held by Gary from 10:30 to 11:00 PST:** 
 +    * https://meet.jit.si/LBLbriefing 
 +    * During this meeting you can ask question and suggest improvements Thursday through Saturday. Feel free to talk and chat, but remember also to keep your camera/video off. 
 + 
 +  * Zynq MPSoC/16nm Test Campaign (April 28-30th, May 1st and 2nd): 
 +    * US Pacific Time: 
 +      * 16:00 to 0:00/midnight on April 28-30th 
 +      * 6:00 to 12:00/noon on May 1st and 2nd 
 +    * CEST: 
 +      * 1:00 to 9:00 April 29-30th and May 1st 
 +      * 15:00 to 21:00 May 2nd and 3rd 
 +    * China: 
 +      * 7:00 to 15:00 April 29-30th and May 1st 
 +      * 21:00 to 3:00 (next day) May 2nd and 3rd
  
-  * **Aug/+? **, ready for initial dynamic heavy ion tests plus config upsets and SEFIs as a by-product  \\ 
-  * **Jul/Aug.? **, Fault Injection Campaign 
-  * **Jun. **, Checkout DUT board and try out the designs in hardware 
-  * **Apr. 30, 2020**, Kickoff builds of KU060 DUT card and another Gen4 backplane batch 
-  * **Jan. 5, 2018**,  Test preparation started, but lots of work left to do.  
-    * Port of test & FuncMon designs from V7 to KU for these primitives: 
-      - IOBs (LVCMOS, LVDS, single-ended HSTL, others? --[ Boeing ]-- 
-      - Clocking (PLL & MMCM)  --[ Boeing ]-- 
-      - IOSERDES     
-      - IODelay 
-      - BRAMs/BRAM ECC/BRAM FIFO 
-    * Port of test & FuncMon designs from V5 to KU for these primitives: 
-      - User Flip-flops (dynamic)  --[ Boeing ]-- 
-      - DCI (on HP I/O's only) 
-      - DSPs (static) 
-      - DSPs (dynamic)  --[ Boeing ]-- 
-      - MGTs --[ BYU ]--  
-          - **initial tests in 2019:** 
-              - SEAKR using their apparatus, Easter (Apr.18-22) 2019 at TAMU 
-              - Boeing using VCU108 dev board,  June 28, 2019 TAMU 
-              - Boeing using VCU108 dev board,  November, 2019 TAMU 
-    * Develop test & FuncMon designs from scratch for these primitives: 
-      - PCIe  --[ BYU, if SHREC sponsor ]-- 
-      - eMac  --[ BYU, if SHREC sponsor ]-- 
-      - SysMon 
-      - Others? \\ 
-    * Develop test & FuncMon designs from scratch for other tests: 
-      - Ring Oscillator  --[ BYU ]-- 
-      - MicroBlaze, single-string and Xilinx TMR IP 
-      - TMR  --[SEAKR? + BYU + others?] -- 
-      - Others? 
  
 ===== US+ 16nm SEL/Latchup Suppression Experiment ===== ===== US+ 16nm SEL/Latchup Suppression Experiment =====
Line 128: Line 125:
   * 1979- Adams et al., “NEUTRON IRRADIATION FOR PREVENTION OF LATCH-UP IN MOS INTEGRATED CIRCUITS”, [[ http://www.iaea.org/inis/collection/NCLCollectionStore/_Public/10/492/10492187.pdf | IAEA paper ]] and [[ http://ieeexplore.ieee.org/document/4330275/ | IEEE-TNS paper]]   * 1979- Adams et al., “NEUTRON IRRADIATION FOR PREVENTION OF LATCH-UP IN MOS INTEGRATED CIRCUITS”, [[ http://www.iaea.org/inis/collection/NCLCollectionStore/_Public/10/492/10492187.pdf | IAEA paper ]] and [[ http://ieeexplore.ieee.org/document/4330275/ | IEEE-TNS paper]]
  
 +===== KU060 Primitives Characterization =====
 +
 +**Current Status:**
 +
 +  * Kintex-Ultrascale (20nm) in manufacturing
 +  * Next Step: Get test IP ready testing is scheduled to start in Summer 2020 at LBNL.
 +
 +
 +**Tested parts:**
 +
 +  * space part: XQRKU060-CNA1509 **(Xilinx-donated)**
 +  * commercial-equivalent part **XCKU060-1FFVA1517I**
 +  * The KU060 DUT card accommodates either part
 +
 +
 +**Target beam trips:**
 +
 +  * Beam time resources needed!
 +  * Berkeley, focused tests, usually 12-24 hours
 +      * ? [ Aerospace/USMDA?]
 +      * first preview beam time sharing together with US+ latchup demo 
 +  * Texas A&M, main data collection tests, usually 48-72 hours
 +      * spare time in August, from Raytheon available if this proposal is granted
 +
 +**Currently allocated beam time:**
 +
 +  * Aerospace: 16 hours promised (TODO assert this is still the case)
 +  * USMDA 48h in 2 groups at Berekely -- 3x8h during Aug. 5th-7th plus 3x8h during Sep. 22nd/27rd 
 +    * (mostly for US+, but also for KU060)
 +  * Boeing: yes, assert how much and when (ideally TAMU)
 +  * RAYTHEON: yes, assert how much and when (ideally TAMU)
 +  * others: please get in touch and let us know!
 +
 +
 +**Schedule:**
 +
 +  * **Aug/+? **, ready for initial dynamic heavy ion tests plus config upsets and SEFIs as a by-product  \\
 +  * **Jul/Aug.? **, Fault Injection Campaign
 +  * **Jun. **, Checkout DUT board and try out the designs in hardware
 +  * **Apr. 30, 2020**, Kickoff builds of KU060 DUT card and another Gen4 backplane batch
 +  * **Jan. 5, 2018**,  Test preparation started, but lots of work left to do. 
 +    * Port of test & FuncMon designs from V7 to KU for these primitives:
 +      - IOBs (LVCMOS, LVDS, single-ended HSTL, others? --[ Boeing ]--
 +      - Clocking (PLL & MMCM)  --[ Boeing ]--
 +      - IOSERDES    
 +      - IODelay
 +      - BRAMs/BRAM ECC/BRAM FIFO
 +    * Port of test & FuncMon designs from V5 to KU for these primitives:
 +      - User Flip-flops (dynamic)  --[ Boeing ]--
 +      - DCI (on HP I/O's only)
 +      - DSPs (static)
 +      - DSPs (dynamic)  --[ Boeing ]--
 +      - MGTs --[ BYU ]-- 
 +          - **initial tests in 2019:**
 +              - SEAKR using their apparatus, Easter (Apr.18-22) 2019 at TAMU
 +              - Boeing using VCU108 dev board,  June 28, 2019 TAMU
 +              - Boeing using VCU108 dev board,  November, 2019 TAMU
 +    * Develop test & FuncMon designs from scratch for these primitives:
 +      - PCIe  --[ BYU, if SHREC sponsor ]--
 +      - eMac  --[ BYU, if SHREC sponsor ]--
 +      - SysMon
 +      - Others? \\
 +    * Develop test & FuncMon designs from scratch for other tests:
 +      - Ring Oscillator  --[ BYU ]--
 +      - MicroBlaze, single-string and Xilinx TMR IP
 +      - TMR  --[SEAKR? + BYU + others?] --
 +      - Others?
  
 ===== Virtex-7 DUT and test opportunities ===== ===== Virtex-7 DUT and test opportunities =====
  • activities.1594892701.txt.gz
  • Last modified: 2020/07/16 09:45
  • by christian