start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
start [2021/05/05 15:15]
christian [Event Schedule]
start [2023/07/06 10:21] (current)
christian
Line 19: Line 19:
  
 === Event Schedule === === Event Schedule ===
-  * 2021 May 12th: Andres Perez Emulating Radiation-Induced Multi-Cell Upset Patterns in SRAM FPGAs with Fault Injection 
- 
-  * Planned Talks, Lectures & Presentations to be scheduled in the near future: 
-    * Gary Swift - Understanding the Limits of Laser Testing and Laser Fault Injection, based on keynote talk at RADHARD2020 
- 
-  * 2021 XRTC Annual Meeting is tentatively scheduled for August, in-person if circumstances allow 
  
 Video recordings and presentation slides of past XRTC events are available in the [[presentation_archive|Archive Section]]. Video recordings and presentation slides of past XRTC events are available in the [[presentation_archive|Archive Section]].
Line 33: Line 27:
   * Contributions from non-members are explicitly welcome and we very much appreciate input from beyond the current horizon.   * Contributions from non-members are explicitly welcome and we very much appreciate input from beyond the current horizon.
   * Yes? Then please submit a proposal including a brief abstract to Gary and Christian via email to Gary.M.Swift (at) ieee.org and christian.fuchs (at) dependable.space   * Yes? Then please submit a proposal including a brief abstract to Gary and Christian via email to Gary.M.Swift (at) ieee.org and christian.fuchs (at) dependable.space
 +
 +=== New XRTC Wednesday Meeting Webex ===
 +
 +We have moved from the Xilinx-hosted Webex Meeting to a new Boeing-hosted instance. Thank you Boeing! Check the [[meetings:access|Meeting-Access wiki-page]] for web-access and phone dial-in details.
  
 ==== Current XRTC Activities ==== ==== Current XRTC Activities ====
Line 38: Line 36:
 === DUT-Card - The Next Generation === === DUT-Card - The Next Generation ===
  
-What do we do next, Versal or Ultrascale+? How do we accelerate and improve the CTI and DUT design process, considering what we have learned from the V7, KU060, and US+Latch-Up experiences.+What do we do next? Versal! How do we accelerate and improve the CTI and DUT design process, considering what we have learned from the V7, KU060, and US+Latch-Up experiences.
  
-DUT Options: 
     * 7nm Versal ACAP     * 7nm Versal ACAP
-    * 16nm Ultrascale+ MPSoC (assuming our latch-up mitigation technique is successful) 
- 
-=== 20nm Kintex-Ultrascale  KU60 DUT === 
- 
-    * KU060 Rev. 1 cards have been manufactured, deliveries in July 2020 
-    * Next Step: 
-      * Get test IP ready testing is scheduled to start after Summer 2020 at LBNL. 
-    * Beam time resources needed! 
-    * Gen4 Backplane and FMC PCB-Fix Available 
- 
-== KU060 Radiation Test at TAMU 19-22 April == 
- 
-  * For the duration of the test campaign no webex meetings will take place 
-  * You can chat with Gary and Mike while they are streaming the test 
-  * There will be an online beam-log (google docs) 
- 
-  * You are invited to join the test via Jitsi Meet by taking your web browser to this URL: 
-    * https://meet.jit.si/TAMUtest (try Chrome or Firefox) 
-    * Password: [[activities:tamu2021|see (internal page)]] OR contact christian.fuchs (at) dependable.space 
- 
-  * KU060 Testing with Boeing (19th - 22nd): 
-  * here are the hours in world time: 
-    * 6:00 to 14:00 US Pacific Time 
-    * 8:00 to 16:00 US Central Time 
-    * 15:00 to 23:00 Central European Summer Time (CEST) 
-    * 21:00 to 5:00 China Time Zone 
-    * 22:00 to 6:00 Japan Time Zone 
- 
-=== 16nm US+ latchup suppression experiment === 
- 
-    * Next Step: Waiting to test functionally in September 
-    * Test boards - ZCU102 with ZU9EG DUT - (6=NGC, 2=Sandia, 2=Aerospace, 3=Xilinx) 
-    * Beam time resources needed: 
-      * <del>USMDA 48h in 2 groups at Berekely</del> 
-        * <del>3x8h during Aug. 5th-7th and 3x8h during Sep. 21st-23rd</del> 
-      * <del>The Berkeley Cyclotron failed, hence testing on Aug. 5th-7th was not possible.</del> 
-      * <del>New test date is scheduled for March 2021</del> 
-      * New test date is scheduled for April 2021 at TAMU 
- 
- 
-== Zynq MPSoC/16nm Latch-Up Mitigation Test at LBL April 28th - May 2nd == 
- 
-  * View the Live-Updated [[https://docs.google.com/document/d/1U7FbZHG_T_049qorlxuMySQYWVYfJ4p9ysJTXDuewf0/edit#heading=h.jltys38rhgql|Beam-Log and Test plan]] (google docs) 
- 
-  * **You are invited to join the test via Jitsi Meet by taking your web browser to this URL:** 
-    * https://meet.jit.si/LBLtest (try Chrome or Firefox) 
-    * Password: [[activities:lb2021|see (internal page)]] OR contact christian.fuchs (at) dependable.space 
-    * **You can use the text-chat function in this call and chat with Gary and Mike while they are streaming. Please make SURE to mute your microphone at all times and turn your camera off. Do not allow camera use. 
-** 
- 
-  * **There will also be an interactive briefing held by Gary from 10:30 to 11:00 PST:** 
-    * https://meet.jit.si/LBLbriefing 
-    * During this meeting you can ask question and suggest improvements Thursday through Saturday. Feel free to talk and chat, but remember also to keep your camera/video off. 
- 
-  * Zynq MPSoC/16nm Test Campaign (April 28-30th, May 1st and 2nd): 
-    * US Pacific Time: 
-      * 16:00 to 0:00/midnight on April 28-30th 
-      * 6:00 to 12:00/noon on May 1st and 2nd 
-    * CEST: 
-      * 1:00 to 9:00 April 29-30th and May 1st 
-      * 15:00 to 21:00 May 2nd and 3rd 
-    * China: 
-      * 7:00 to 15:00 April 29-30th and May 1st 
-      * 21:00 to 3:00 (next day) May 2nd and 3rd 
- 
  
 === Virtex-7 Campaign Result Publication === === Virtex-7 Campaign Result Publication ===
  • start.1620227722.txt.gz
  • Last modified: 2021/05/05 15:15
  • by christian